措施工程在矿山基建过程中的应用

  • 张文官|冯凯
  • 作者单位:
  • 苏尼特金曦黄金矿业有限责任公司|苏尼特金曦黄金矿业有限责任公司
  • 基金项目:

  • isnull
  • 详细信息:

  • 作者简介:
  • 张文官(1988—),男,甘肃张掖人,助理工程师,从事金属矿山采矿技术及管理工作;内蒙古自治区锡林郭勒盟苏尼特右旗朱日和镇,苏尼特金曦黄金矿业有限责任公司,011200;E-mail:461024735@qq.com
  • 通讯作者:
  • isnull
  • 此文档没有上传!

Application of measure project in the process of mine infrastructure construction

  • English Author:
  • Sunite Jinxi Gold Mining Industry Co.,Ltd.| Sunite Jinxi Gold Mining Industry Co.,Ltd.
  • Unit:
  • 摘要
  • 在线预览
  • 参考文献

摘要:

措施工程具有投入少、见效快的特点,多应用于矿山基建过程中,确保主体工程顺利进行。内蒙古某矿山露天转地下开采的转型期中存在基建工程量大且工作面难于展开等难题,为加快基建进度,缩短基建工期,充分利用露天开采工程,实施了多项有效的措施工程。详细介绍了露采坑平硐、主运巷溜井、斜坡道硐室、斜溜井等措施工程及应用工况。措施工程的应用既改善了作业基础,提高了劳动效率,降低了采掘成本,节约了提升、运输费用20多万元,缩短了基建工期,又为后期无底柱分段崩落采矿法开采奠定了基础,可供其他同类型矿山基建工程施工借鉴参考。

关键词:

露天转地下;转型期;基建工程;措施工程;施工进度

Abstract:

Measure project invests less and comes into effect more quickly.It is commonly applied in mine infrastructure construction and ensures the smooth progress of the major project.The workload for infrastructure construction is huge and the workface is hard to conduct in the openpit to underground transition of a mine from Inner Mongolia,to speed up and shorten the construction and make full use of the open-pit mining project,many effective measure adit projects are carried out.The paper described in detail the open-pit adit,main haulage ore pass,ramp adit,ramp chute and their application status.The application of the measure projects not only improves operation conditions but also improves working efficiency and lowers excavation cost,saving more than 200 000 yuan from hoisting and transportation fees and shortening the construction.These projects lay foundation for the subsequent pillarless sublevel caving mining method and can provide reference for similar mine infrastructure construction in other mines.

Keywords:

transition from open-pit to underground;transition;infrastructure project;measure project;construction progress