眼前山铁矿三维可视化仿真井下通风系统优化研究

  • 牛文杰|姜鹏|侯卫钢|黄铂然|黄浩|王培涛
  • 作者单位:
  • 鞍钢集团矿业设计研究院有限公司|鞍钢集团矿业设计研究院有限公司|鞍钢集团矿业设计研究院有限公司|北京科技大学土木与资源工程学院|北京科技大学土木与资源工程学院|北京科技大学土木与资源工程学院
  • 基金项目:

  • 国家自然科学基金项目(52074020)
  • 详细信息:

  • 作者简介:
  • 牛文杰(1975—),男,高级工程师,从事铁矿山资源开发研究设计工作;E-mail:asnwj@163.com
  • 通讯作者:
  • 王培涛(1987—),男,副教授,博士,从事裂隙岩体力学等方面研究工作;E-mail:wangpeitao@ustb.edu.cn
  • PDF下载

Optimization of the underground ventilation system using 3D visualization simulation for Yanqianshan Iron Mine

  • English Author:
  • Ansteel Mining Engineering Corporation|Ansteel Mining Engineering Corporation|Ansteel Mining Engineering Corporation|School of Civil and Resource Engineering,University of Science and Technology Beijing|School of Civil and Resource Engineering,University of Science and Technology Beijing|School of Civil and Resource Engineering,University of Science and Technology Beijing
  • Unit:
  • 摘要
  • 在线预览
  • 参考文献

摘要:

随着矿井掘进深度不断增加,通风从容易时期过渡到困难时期。针对眼前山铁矿井下工作面温度较高、风量小的潜在问题,以-269 m水平为研究对象,提出2种优化改造方案,通过建立眼前山铁矿三维可视化仿真井下通风系统模型,采用矿井通风系统网络分析软件进行三维仿真和网络解算,对通风优化方案进行模拟分析。优化后的通风系统数值模拟结果显示:采用方案一使得-269 m巷道的北部区域风量平均提升1.13 m3/s,温度平均降低0.14 ℃;采用方案二使得-269 m巷道内的整体风量平均提升5.51 m3/s,且开采区附近大部分巷道内整体温度平均降低0.34 ℃。对比显示,方案二巷道内的增风降温幅度更大、影响范围更广。2种方案均起到了对通风系统的优化作用,为国内大部分地下开采矿山的井下通风系统优化治理工作提供了一定的参考价值。

关键词:

深部开采;可视化;三维仿真模拟;通风网络解算;通风系统;Scott-Hinsley算法

Abstract:

As the depth of mine excavation increases,ventilation shifts from an easy to a challenging phase.To address potential issues of high temperature and low airflow in the underground working face of Yanqianshan Iron Mine,2 optimization plans were proposed with the -269 m level as the research subject.A 3D visualization simulation model of the underground ventilation system was created,and mine ventilation system network analysis software was used for 3D simulation and network calculations to simulate and analyze the optimization plans.Numerical simulation results of the optimized ventilation system showed that Plan 1 increased the average airflow in the northern area of the -269 m roadway by 1.13 m3/s and decreased the temperature by an average of 0.14 ℃ .Plan 2 increased the overall airflow in the -269 m roadway by an average of 5.51 m3/s,with a temperature reduction of 0.34 ℃ in most roadways near the mining area.A comparison indicates that Plan 2 provided a greater increase in airflow and a wider impact range for temperature reduction.Both plans improved the ventilation system,offering valuable reference for optimizing underground ventilation systems in most domestic underground mines.

Keywords:

deep mining;visualization;3D simulation;ventilation network calculation;ventilation system;Scott-Hinsley algorithm