• captcha

中国科技核心期刊

美国化学文摘社(CAS)数据库

美国EBSCO学术数据库

日本科学技术振兴机构数据库(JST)

期刊导读

首页   >    安环与分析

高硅尾渣生产欧式连锁陶瓷瓦中试试验研究

  • 作者:
  • 马鹏程|王乐译|姜桂鹏|高金成|栾作春|孙其飞|杨鹏
  • 作者单位:
  • 山东招金集团有限公司|山东招金集团有限公司|山东招金集团有限公司|山东招金集团有限公司|山东招金集团有限公司|山东招金集团有限公司|山东招金集团有限公司
  • 基金项目:

  • 国家重点研发计划项目(2018YFC1902003)
  • 详细信息:

  • 作者简介:
  • 马鹏程(1983—),男,高级工程师,从事冶金资源综合利用工作;E-mail:124692329@qq.com
  • 通讯作者:
  • isnull
  • PDF下载

Pilot test on the production of European-style interlocking ceramic tiles using high-silicon tailings

  • English Author:
  • Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.|Shandong Zhaojin Group Co.,Ltd.
  • Unit:
  • 摘要
  • 在线预览
  • 参考文献

摘要:

为解决黄金行业氰化尾渣大量堆存问题,实现高硅尾渣大宗利用,在前期实验室小型试验成功的基础上,开展了以高硅尾渣为主要原材料生产欧式连锁陶瓷瓦的中试试验研究。结果表明:在烧成温度1 100 ℃、烧成时间56 min条件下,可实现高硅尾渣掺量高达70  %的陶瓷瓦烧成,且成功解决了产品黑心、变形等质量问题,吸水率与强度等指标均满足GB/T 21149—2007 《烧结瓦》中Ⅱ类烧结瓦要求。该技术实现了高硅尾渣的无害化、资源化、产品化利用。

关键词:

氰化尾渣;高硅尾渣;综合利用;资源化;陶瓷瓦;烧成温度;烧成时间;中试试验

Abstract:

To address the problem of large-scale cyanide tailings storage in the gold industry and achieve bulk utilization of high-silicon tailings,a pilot test was conducted based on previous successful small-scale laboratory experiments.This study focused on producing European-style interlocking ceramic tiles using high-silicon tailings as the primary raw material.The results indicated that,under firing conditions of 1 100 °C and a firing time of 56 min,ceramic tiles with up to 70 % high-silicon tailings content could be successfully produced.This approach effectively resolved issues related to black core and deformation,meeting the standards for water absorption and strength set out in GB/T 21149-2007 for Type Ⅱ sintered tiles.This technology realizes the harmless,resource-based,and product-oriented utilization of high-silicon tailings.

Keywords:

cyanide tailings;high-silicon tailings;comprehensive utilization;resource-based utilization;ceramic tiles;firing temperature;firing time;pilot test