环境影响下基于CRITIC法的露天矿山道路综合成本分析

  • 作者:
  • 温晨|黄敏|饶帝军|谢成龙|蔡思杰

  • 作者单位:
  • (1. 紫金矿业集团股份有限公司;2. 紫金(长沙) 工程技术有限公司; 3. 低品位难处理黄金资源综合利用国家重点实验室)
  • 基金项目:

  • 国家自然科学基金项目(51804079);福建省自然科学基金项目(2019J05039);国家重点研发计划专项(2022YFC2903900);紫金矿业集 团股份有限公司2022 年科技计划项目(5401KY2022100003);福厦泉自创区协同专项资助项目(35022CQX72021009)
  • 详细信息:

  • 作者简介:
  • 温晨(1998—),男,助理工程师,硕士,研究方向为控制爆破及岩层控制;E⁃mail:1398448249@qq. com
  • PDF下载

Comprehensive cost analysis of open‑pit mine roads under environmental impact based on the CRITIC method

  • English Author:
  • Wen Chen¹, ², ³, Huang Min¹, ², ³, Rao Dijun¹, ², ³, Xie Chenglong¹, ², ³, Cai Sijie¹, ², ³

  • Unit:
  • (1. Zijin Mining Group Co., Ltd.; 2. Zijin(Changsha)Engineering Technology Co., Ltd.; 3. State Key Laboratory of Comprehensive Utilization of Low‑grade Refractory Gold Ores)
  • 摘要
  • 在线预览
  • 参考文献

摘要:

随着“双碳”目标的实施及投资者对矿山企业 ESG指标的要求,在分析露天矿山道路综合成本时需要考虑环境成本。研究基于CRITIC法构建涉及材料、人力、机械、维护、碳排放、降尘、环境毒性、运输效率、构件寿命和轮胎损耗等10种因素的露天矿山道路综合成本分析模型。以紫金山金铜矿为例,通过信息承载量分析法,得到各指标的客观权重,降低指标间的相互影响。经计算,道路量化综合成本为:碎石路 98.6 元/m2,水泥路 108.5 元/m2,面层改性路 62.9 元/m2,整体改性路67.7元/m2。相对于碎石路和传统水泥路,改性道路在综合成本上具备显著优势,其中,面层改性路的综合成本优势超36%。  

关键词:

露天矿山;CRITIC法;改性道路;ESG;综合成本;环境影响;成本管理

Abstract:

With the implementation of China's "dual-carbon"target and increasing investor focus on ESG metrics. environmental costs must be integrated into the comprehensive cost analysis of open-pit mine roads. This study constructs a cost analysis model for the comprehensive cost of open-pit mine roads using the CRITIC method, incorporating 10 factors: material, labor, machinery, maintenance, carbon emissions, dust suppression, environmental toxicity, transport efficiency, component lifespan, and tire wear. Taking the Zijinshan Gold-Copper Mine as a case study, objective weights for each indicator were derived through information load analysis to mitigate inter-indicator correlations. Calculated quantitative comprehensive road costs are: gravel roads 98.6 yuan/m?, cement roads 108.5 yuan/m , surface-modified roads 62.9 yuan/m2,and overall modified roads 67.7 yuan/m2. Compared to gravel and conventional cement roads, modified roads exhibit significant cost advantages, with surface-modified roads achieving a reduction in comprehensive costs of over 36 %.

Keywords:

open‑pit mine; CRITIC method; modified road; ESG; comprehensive cost; environmental impact; cost management