中国科技核心期刊
美国化学文摘社(CAS)数据库
美国EBSCO学术数据库
日本科学技术振兴机构数据库(JST)
白杨
Bai Yang
针对某黄金矿山在长期堆浸生产过程中存在钙、镁等贱金属阳离子积累而影响生产效率和质量的问题,提出了贫液二氧化碳初步除钙与贵液阻垢剂深度除钙联合技术方案。通过试验确定了最佳工艺参数:贫液pH值调整至11.5~12.0,二氧化碳充气压力控制在0.25 MPa,反应时间设定为 1.5 h,贫液二氧化碳初步除钙效率可稳定达到 90 %以上;向贵液中添加优选的 DN3 阻垢剂,在添加量900 mg/L条件下,载金炭钙吸附量减少了1.76 百分点,金吸附率提高了13.38 百分点,酸洗再生成本显著降低。连续试验结果表明,采用该联合技术可降低钙、镁离子的影响,提高金的吸附效果,对改善生产工艺具有重要意义。
In response to the accumulation of base metal cations such as calcium and magnesium during long-term heap leaching operations at a gold mine, which negatively affects production efficiency and quality, a combined technical scheme was proposed involving preliminary calcium removal from barren solution using carbon dioxide and deep calcium removal from pregnant solution using a scale inhibitor. Experimental results determined the optimal process parameters: adjusting the pH of the barren solution to 11.5-12.0, maintaining the carbon dioxide injection pressure at 0.25 MPa, and setting the reaction time to 1.5 h. Under these conditions, the preliminary calcium removal efficiency from the bar-ren solution can stably exceed 90 %. By adding the optimized DN3 scale inhibitor to the pregnant solution at a dosage of 900 mg/L, the calcium adsorption on gold-loaded carbon was reduced by 1.76 percentage points, while the gold adsorp-tion rate increased by 13.38 percentage points, and the cost of acid washing regeneration was significantly reduced. Continu-ous testing demonstrated that this combined technique effectively reduces the impact of calcium and magnesium ions, enhances gold adsorption, and plays a significant role in improving the production process.