[1] 蔡鑫,黄涯帅,周子龙,等 .基于矿柱失稳风险分析的采空区关键矿柱重定义与辨识[J].岩石力学与工程学报,2024,43(1):216-225.
[2] 朱万成,董航宇,刘溪鸽,等 .金属矿山多矿柱承载与失稳破坏研究[J].采矿与岩层控制工程学报,2022,4(4):5-31.
[3] 张宏荣,张纯锋,付琛,等 .丰山铜矿北缘试验采场稳定性研究[J].黄金,2024,45(8):64-67,80.
[4] 王长军,卢磊芬,秦仕文,等 .三贵口铅锌矿矿柱回收对地表沉陷影响研究[J].中国矿业,2024,33(3):168-176.
[5] 何玉龙,王栋毅,李海龙 .BMS微震监测系统在深部岩体稳定性监测中的应用[J].黄金,2024,45(4):5-8,17.
[6] 罗辉,杨仕教,陶干强,等 .基于FEM-ANN-MCS动态模糊可靠度的矿柱稳定性分析[J].煤炭学报,2010,35(4):551-554.
[7] ZHOU J,LI X,SHI X,et al.Predicting pillar stability for undergroundmine using fisher discriminant analysis and SVM methods[J].Transactions of Nonferrous Metals Society of China,2011,21(12):2 734-2 743.
[8] 张文革,董陇军,王加闯,等 .基于机器学习算法及 Stacking融合集成模型的矿柱稳定性分析[J].金属矿山,2023(10):67-74.
[9] 郭慧,刘明艳 .基于遗传算法和随机森林的入侵检测方法研究[J].计算机应用与软件,2024,41(1):304-309,314.
[10] ZHOU J,LI X B,MITRI HANI S.Comparative performance of sixsupervised learning methods for the development of models of hardrock pillar stability prediction[J].Natural Hazards,2015,79(1):291-316.
[11] 袁小庆,吴涛,原勋,等 .基于GSO-RF意图识别算法的全身助力外骨骼控制方法研究[J].机械工程学报,2024,60(17):91-101.
[12] XUE J,SHEN B.Dung beetle optimizer:A new meta‑heuristic algo‑rithm for global optimization[J]. The Journal of Supercomputing,2022:1-32.
[13] 黄元春,张凌波 .改进的鲸鱼优化算法及其应用[J].计算机工程与应用,2019,55(21):220-226,270.
[14] 游达章,刘姗,张业鹏,等 .基于 IWOA-ELM的模拟电路故障诊断方法[J].仪表技术与传感器,2024(2):104-110.
[15] 汪洋,陈俊杰,谢梦雨,等 .基于LCASO-BPNN模型的单质硫溶解度预测[J].化学工程,2023,51(12):56-61.
[16] 田军锋,彭静静,左宪禹,等 .基于循环移位和多混沌映射的图像加密算法[J].计算机科学,2020,47(10):327-331.
[17] 肖义平,赵云峰 .基于混沌映射和高斯扰动的改进粒子群算法MPPT控制策略研究
[J/OL].电源学报,1-13
[2024-12-11].http:∥kns.cnki.net/kcms/detail/12.1420.TM.20230224.0938.002.html.
[18] 印雷,顾德,刘飞 .基于改进麻雀搜索算法优化的DV-Hop定位算法[J].传感技术学报,2021,34(5):670-675.
[19] XIN Y,YONG L,GUANGMING L.Evolutionary programming madefaster[J].IEEE Transactions on Evolutionary Computation,1999,3(2):82-102.
[20] LUNDER P J.Hard rock pillar strength estimation an appliedempirical approach[J].Vancouver:University of British Columbia,1961.
[21] VON KIMMELMANN M R,HYDE B,MADGWICK R J.The use ofcomputer applications at BCL Limited in planning pillar extractionand the design of mining layouts
[C]∥British Geotechnical Asso‑ciation. Design and performance of underground excavations.London:British Geotechnical Association,1984:53-63.
[22] S SJOBERG J S.Failuremodes and pillar behaviour in the Zinkgruvanmine
[C]∥American Rock Mechanics Association. Proceedings ofthe 33rd U. S. symposium on rock mechanics. Alexandria:Ameri‑can Rock Mechanics Association,1992:491-500.
[23] ESTERHUIZEN G S,DOLINAR D R,ELLENBERGER J L.Pillarstrength in underground stone mines in the United States[J].Inter‑national Journal of Rock Mechanics and Mining Sciences,2011,48(1):42-50.
[24] POTVIN Y,HUDYMA M,MILLER H. Rib pillar design in openstope mining[J].CIM BULLETIN,1989,82(927):31-36.
[25] HEDLEY D G F,GRANT F.Stope‑and‑pillar design for the Elliotlake uranium mines[J].Bull Can Inst Min Metall,1972,65:37-44.
[26] 赵国彦,刘建 .基于高斯过程机器学习算法的矿柱稳定性分析[J].安全与环境学报,2017,17(5):1 725-1 729.
[27] 刘小春,张小瑞,刘博 .三鑫金铜矿保安矿柱回收合理充填体强度研究[J].黄金,2024,45(4):13-17.
[28] LI C,ZHOU J,DU K,et al.Stability prediction of hard rock pillarusing support vector machine optimized by three metaheuristicalgorithms[J].International Journal of Mining Science and Techno‑logy,2023,33(8):1 019-1 036.
[29] SAMUI P,KIM D,SITHARAM T G.Support vector machine for evalu‑ating seismic‑liquefaction potential using shear wave velocity[J].Journal of Applied Geophysics,2011,73(1):8-15.
[30] 吴志波,刘佳鹏,徐敬元,等 .基于自组织神经网络与元启发式算法的地表爆破振动预测方法[J].黄金,2024,45(11):69-74.Research on pillar stability prediction based on IDBO-RF modelXie Chenglong1,2,3, Huang Min1,2,3, Gao Zhong1,2,3, Li Dong1,2,3, Song Xianliang1,2,3, Wen Chen1,2,3(1. State Key Laboratory of Comprehensive Utilization of Low‑grade Refractory Gold Ores;2. Zijin Mining Group Co., Ltd.; 3. Zijin(Changsha)Engineering Technology Co., Ltd.)