基于正交试验设计的采场结构参数优化及应用

  • 作者:
  • 范文涛|刘雷磊
  • 作者单位:
  • 山东黄金矿业股份有限公司|中南大学资源与安全工程学院
  • 基金项目:

  • 国家重点研发计划项目(2018YFC0604606)
  • 详细信息:

  • 作者简介:
  • 范文涛(1986—),男,内蒙古赤峰人,工程师,硕士,从事采矿工艺、矿山地压与岩层控制等研究工作;济南市历城区经十路2503号,山东黄金矿业股份有限公司,250100;E-mail:fanta.cn@163.com
  • 通讯作者:
  • E-mail:leilei_liu@csu.edu.cn,15211062383
  • 此文档没有上传!

Optimization of stope structure parameters based on orthogonal experimental design and its application

  • English Author:
  • Shandong Gold Mining Co.,Ltd.|School of Resource and Safety Engineering,Central South University
  • Unit:
  • 摘要
  • 在线预览
  • 参考文献

摘要:

采场结构参数的优化选择对矿山的安全生产和经济效益有着重要意义。以内蒙古某银多金属矿为背景,结合矿山的采矿方法和开采技术条件,利用正交试验设计方法,针对采场进路的长、宽?⒏呱杓屏9种不同采场结构参数的数值模拟方案,利用Rhinoceros建模软件耦合Flac3D软件对这9种方案进行一步采和二步采数值模拟分析,并对9种方案的各个指标进行极差分析,结果表明:进路的高度对这些指标的影响较大,其次是宽度和长度。从安全、经济和技术方面综合考虑,确定方案5:进路长度25 m、进路宽度3.5 m、进路高度3.5 m的采场结构参数最优。现场工业试验表明:方案5效果良好,采矿损失率8 %,矿石贫化率5 %,提高了出矿效率,回采时能够有效控制地压,确保了回采过程的安全、经济、高效。

关键词:

采场结构参数;正交试验设计;数值模拟;拉应力;塑性区

Abstract:

Optimal selection of stope structure parameters is of great significance to safety production and economic benefits of mines.This paper,taking a silver polymetallic deposit in Inner Mongolia as an example,based on the mining method and mining technical conditions of the mine and using the orthogonal experiment design method,9 numerical simulation schemes with different stope structure parameters are designed based on the length,width and height,and Rhinoceros modeling software coupled Flac3D simulation analysis software is used to numerically simulate and analyze the one-step and two-step mining methods in the 9 schemes.Range analysis was conducted for each index of the 9 simulation schemes.The results showed that the height of the approach has a greater impact on these indicators,followed by width and length.Finally,comprehensive considerations of the safety,economy and technology determined the stope structural parameters of Scheme 5,in which the approach length is 25 m,width is 3.5 m,height is 3.5 m,to be the best.Field industrial test shows that the Scheme 5 is the best,with mining loss rate to be 8 %,ore dilution rate 5 %,and increased ore drawing efficiency.Besides,the ground pressure can be effectively controlled during extraction,and the safety,economy and efficiency are ensured.

Keywords:

stope structure parameters;orthogonal experimental design;numerical simulation;tensile stress;plastic zone