Chinese core journals in science and technology

Chemical Abstracts Service (CAS) database

EBSCO Academic Database in the United States

Japan Science and Technology Agency Database (JST)

Journal Guide

Home   >   Journal Articles

Management of the project construction cost for thousand-meter-level vertical shafts in metal mines based on LS-SVM

  • English Author:
  • Changchun Gold Design Institute Co.,Ltd.|Haitong Unitrust International Financial Leasing Co.,Ltd.
  • Unit:
  • PDF Download
  • Abstract
  • Online Preview
  • References

Abstract:

The cost control structure of metal mine vertical shaft engineering is often set as a single layer,which leads to low control efficiency and an increase in the final cost difference.Based on actual control needs and standards,an equivalent cost control target is set,and a multi-stage control form is adopted to improve the overall cost control efficiency.The cost control structure is completed,and a metal mine thousand-meter-level vertical shaft engineering cost control model based on LS-SVM is established.The cost control is achieved through the dynamic monitoring of the vertical shaft engineering and LS-SVM correction.Test results show that after 5 measurements,compared with the traditional fuzzy adaptive BP engineering cost control group and the traditional BIM engineering cost control group,the LS-SVM engineering cost control group finally controls the controllable cost difference within 30 000 yuan.This indicates that the targeted and stable cost control method has better control effects and practical value.

Keywords:

LS-SVM;metal mine;thousand-meter-level vertical shaft engineering;cost control;control methods;cost adjustment