Chinese core journals in science and technology

Chemical Abstracts Service (CAS) database

EBSCO Academic Database in the United States

Japan Science and Technology Agency Database (JST)

Journal Guide

Home   >   Journal Articles

Study on the optimization of stope structural parameters of Hongling Lead-Zinc Mine

  • English Author:
  • Chifeng Shanjin Hongling Nonferrous Mining Co.,Ltd.|Chifeng Shanjin Hongling Nonferrous Mining Co.,Ltd.|Chifeng Shanjin Hongling Nonferrous Mining Co.,Ltd.
  • Unit:
  • PDF Download
  • Abstract
  • Online Preview
  • References

Abstract:

To determine the reasonable stope structural parameters for the sublevel drilling stage open stope and subsequent filling mining method in Hongling Lead-Zinc Mine,numerical simulation was employed to study 16 different scenarios with roof thicknesses of 3 m,5 m,7 m,and 10 m,and stope lengths of 20 m,30 m,40 m,and 60 m,respectively.The stress,displacement,and plastic zone distribution of each scenario with a roof thickness of 3 m were compared.The results indicate that the stability of the stope in Hongling Lead-Zinc Mine is fairly good when the roof thickness is 3 m and the stope length is 35 m for the sublevel drilling stage open stope and subsequent filling mining method.

Keywords:

sublevel drilling;stage open stope and subsequent filling mining;stope structural parameters;roof thickness;stope length;mining area stability