Chinese core journals in science and technology
Chemical Abstracts Service (CAS) database
EBSCO Academic Database in the United States
Japan Science and Technology Agency Database (JST)
In response to the issue of resource depletion in an old gold mine,this study proposes 2 recovery schemes to effectively utilize shallow high-grade residual ore resources:one with reserved crown pillars and one without.The reserved crown pillar scheme includes options for 1 m and 0.5 m pillars,while the no reserved pillar scheme involves grouting consolidation with thicknesses of 5 m and 10 m.Based on the results of numerical simulations,the joint support method of partial crown pillar reservation and grouting consolidation of dry backfill materials was selected,with a reserved crown pillar thickness of 1 m and grouting consolidation thickness of 5 m.The process flow for residual ore recovery is detailed.By grouting and consolidating the existing loose backfill material in the upper voids of the trial stope,4 500 t ores containing 24 kg gold were successfully recovered,yielding an economic benefit of 6.619 8 million yuan.The success of this trial will continue to guide future residual ore recovery efforts in the enterprise.