Chinese core journals in science and technology

Chemical Abstracts Service (CAS) database

EBSCO Academic Database in the United States

Japan Science and Technology Agency Database (JST)

Journal Guide

Home   >   Journal Articles

Application of sectioned and stripped medium long hole recovery process in Jinfeng Gold Mine

  • English Author:
  • Changchun Gold Research Institute Co.,Ltd.|Changchun Gold Research Institute Co.,Ltd. |Changchun Gold Research Institute Co.,Ltd.
  • Unit:
  • This document has not been uploaded!
  • Abstract
  • Online Preview
  • References

Abstract:

The mining loss is big and the operation safety is poor when the previous medium long hole recovery process was used in Jinfeng Gold Mine to mine the fragile and broken rock mass.So,the paper proposes to use sectioned and stripped medium long hole recovery process and carries out field industrial tests.Good experimental effect is achieved by applying shaft-sinking-by-single-medium-long-hole-blasting technique and drilling blasting parameters optimization.The operation capacity is increased to 375 t/d,the mining loss rate is reduced to 9.2 %,ore dilution rate is 10.3 %.The mining loss and dilution are greatly improved.The research has guiding significance to mines with similar conditions at home and abroad.


Keywords:

fragile and broken rock mass;sectioned and stripped;medium long hole;shaft sinking by single time blasting;blasting parameter