Chinese core journals in science and technology

Chemical Abstracts Service (CAS) database

EBSCO Academic Database in the United States

Japan Science and Technology Agency Database (JST)

Journal Guide

Home   >   Journal Articles

Application of trackless equipment in the underground mining operation of gold mines—A case study of Guizhou Jinfeng Mining Limited

  • English Author:
  • Sunite Jinxi Gold Mining Co.,Ltd.|Sunite Jinxi Gold Mining Co.,Ltd.|Sunite Jinxi Gold Mining Co.,Ltd.
  • Unit:
  • This document has not been uploaded!
  • Abstract
  • Online Preview
  • References

Abstract:

The geological conditions are complex,the wall rocks and ore bodies are fragmented,the structure develops,the stability is poor and the hardness is low in Jinfeng Gold Mine,and large-section fully supported roadways are used.Overseas large-scale trackless equipment is successfully installed to carry out mechanized operation.According to the construcion procees,the paper in detail introduced the related parameters and onsite application of underground mining trackless mining equipment,ore-drawing equipment and auxiliary equipment in Jinfeng Gold Mine.Mechanized mining is achieved by using trackless equipment,and the production capacity can reach 750 000 t/a in Phase 1,and 1 200 000 t/a in Phase 2.Good economic and social benefits are achieved.The application provides reference for the promotion of trackless mining equipment in underground metal mines.

Keywords:

geological conditions;trackless equipment;ramp;gold mine;mechanization