Chinese core journals in science and technology

Chemical Abstracts Service (CAS) database

EBSCO Academic Database in the United States

Japan Science and Technology Agency Database (JST)

Journal Guide

Home   >   Journal Articles

Optimization,modification and application of cemented fine tailings backfilling process in Hedong mining area

  • English Author:
  • Zhaoyuan Guoxin Asset Management Co.,Ltd.|Canzhuang Gold Mine,Zhaojin Mining Industry Co.,Ltd.
  • Unit:
  • PDF Download
  • Abstract
  • Online Preview
  • References

Abstract:

The graded coarse-grained tailings from the ore-dressing plant in Hedong mining area of Canzhuang Gold Mine was backfilled into the goaf,and the remaining overflow fine tailings are all stored into the tailing pond.In view of the fact that the tailing pond in Hedong mining area has been basically saturated,and the drainage volume in the shaft is great and the mining recovery rate is low,the optimization and modification of the cemented fine tailings backfilling process are carried out.The paper details the modification process of filling process.After the cemented fine tailings backfilling process is put into operation,the discharge of solid waste from mines is greatly reduced,realizing the mine production free of tailings,fundamentally solving the inability to construct tailings pond,improving the mining recovery rate,creating economic benefits of 4.7 million yuan/a and indicating good results.The process can be referred to by similar mines.

Keywords:

graded tailings;fine tailings;cemented filling;mine without tailings;mining extraction rate;filling process