深井矿山人工制冷降温系统优选与应用

Selection and application of artificial refrigeration cooling systems for deep mines

  • 摘要: 针对三山岛金矿深部开采热害加剧、常规通风降温能力不足的问题,基于现场热湿环境测量,构建−1 140 m水平简化模型,对地面制冷—井下输送冷冻水、井下制冷—地面冷却水排热和地面制冰—井下输冰3种人工制冷方案进行冷负荷计算与技术经济比较,并结合−1 140 m水平局部制冷试验评价人工制冷末端供冷的工程适用性。结果表明:设计工况下4个分巷总需冷量约4.40 MW,总处理风量约105.32 m3/s;按设备清单统计,3种方案的装机功率分别为1.813 MW、2.513 MW和4.714 MW,设备投资分别约为1 600万元、1 206万元和1 975万元。地面制冷—井下输送冷冻水方案装机功率最低、设备投资处于中等水平,综合性能最优。局部制冷试运行时,1个模块运行可使作业区环境温度由约37 ℃降至约32 ℃。研究表明,地面制冷—井下输送冷冻水系统可作为三山岛金矿未来深部集中制冷的优选方案,但长距离高压输冷、管路保冷、防腐和水处理等关键环节仍需进一步工程验证。

     

    Abstract: A simplified model of the −1 140 m level was built based on field measurements of the thermal and humid environment to address the intensifying thermal hazard and insufficient cooling capacity of conventional ventilation during deep mining in the Sanshandao Gold Mine. Three artificial refrigeration schemes, including surface refrigeration with chilled-water delivery underground, underground refrigeration with heat rejection through cooling water to the surface, and surface ice production with underground ice delivery, were compared in terms of cooling load and techno-economic performance. A local refrigeration trial at the −1 140 m level was combined to assess the engineering applicability of terminal cooling for artificial refrigeration. The results show that in the design conditions, the total cooling demand of four branch roadways is approximately 4.40 MW, and the air-handling rate is 105.32 m3/s. Based on the equipment lists, the installed power rating of the three schemes is 1.813 MW, 2.513 MW, and 4.714 MW, with the equipment investment of approximately 16.00 million RMB, 12.06 million RMB, and 19.75 million RMB, respectively. The surface refrigeration with chilled-water delivery underground scheme exhibits the lowest installed power rating, a moderate equipment investment, and the optimal overall performance. During the trial operation of local refrigeration, operating one module can reduce the ambient temperature in the working area from approximately 37 °C to 32 °C. The results indicate that surface refrigeration with chilled-water delivery underground is a preferred option for future centralized cooling in deep workings. However, long-distance high-pressure cold transport, pipeline insulation, corrosion control, and water treatment require further engineering verification.

     

/

返回文章
返回