  • 摘要: 固体矿产资源量估算过程中,大厚度工程是否处理、采取何种方法处理,地质行业一直未取得共识,在岩金矿床的估算过程中更是如此。以广西某岩金矿床为例,采用5种方法对大厚度工程进行处理并对比分析,探讨确定大厚度工程处理阈值及处理方法的相关问题,以供固体矿产资源量估算参考。

     

    Abstract: In the process of solid mineral resources estimation,the geological industry has not reached a consensus on whether to deal with large-thickness projects and with what methods to deal with them,especially during the rock gold resources estimation.In a case study of a rock gold deposit in Guangxi,the study uses 5 different methods to deal with the large-thickness project,compares and analyzes them,and discusses the related problems in determining the threshold and method of large-thickness projects treatment,so as to provide a reference for the estimation of solid mine-ral resources.

     

/